iconEnergyPage
Feasibility Studies

 

As a preliminary stage before establishing a new plant, process or applying a new method or technology,
it is important to evaluate and analyze the different aspects of the future application.

KTE provides feasibility studies in the energy and environment industry for new and conventional technologies:

  • Technology and process description and review.
  • Technology and/or process evaluation.
  • Any necessary design: Conceptual, P&ID, etc.
  • Mass & Energy Balance.
  • Techno-economic evaluation and analysis.

The feasibility study of KTE enables our client a better perception through the pre-investment decision-making process.

Projects

Client: Undisclosed
Description:
Determination of Dioxins & Furans sources, concentrations and global amount.
Flue Gases treatment system for D&F and Chlorine pollution treatment.

  • D&F emission survey in the plant stacks
  • Design of treatment system including Scrubbers and ESP

Dioxins-and-Furans-in-Production-Process

Client: Kibbutz “Ein Gedi”
Description:
Preliminary techno-economic evaluation on the feasibility of exploiting crude oil and
gas for energy production in Kibbutz “Ein Gedi”.

Crude-Oil-and-Gas-Exploitation-in-Kibbutz-Ein-Gedi

Client: Ginko Ltd.
Description:

  • Techno-economic Evaluation of Water/Oil Separation in an oilfield drilling in Israel
  • Plant Layout & Process Design

Water-Oil-Separation-of-an-oilfield-drilling

GTL Plant Design – Production of 900 BBLD Distillates Blend and LPG from
Associated Gas (Givot Olam, Crude oil Drilling) based on Fischer Tropsch Reaction

  • Conceptual Design
  • Process Simulation
  • Mass and Energy Balance
  • Plant layout and major equipment sizing
  • Economic Evaluation

GIVOT-OLAM

GTL section in PARETO report of “Integration of Alternative Fuels from Natural Gas
in Israel Transportation System” Production of 45,000 BBLD of Gasoline and Diesel: Technological and Economic Evaluation.

GTL-Report

Client: Meniv Rishon Ltd.
Description:

  • Techno-economic evaluation and analysis
  • Design and installation of 3.5kW PV cells

Grid-Connected-Photovoltaic-System-on-Water-Tower

Client: Telos Ltd.
Description:

  • Technology evaluation and assessment
  • Techno-economic feasibility study for Water/Oil Separation in Crude Oil Plant
  • Conceptual & Process Design

Water-Oil-Separation-Plant